image

Rail Construction and Maintenance Operatives

Rail construction and maintenance operatives lay, re-lay, repair and examine railway track and maintain surrounding areas.

Entry Reqirements

Level 2 NVQ; GCSE at grades A*-C

Typical Tasks

  • Fastens together sections of rail by bolting fishplates to rails.
  • Positions lengths of rail, sets of points and crossovers and secures rail with bolts, wooden wedges or clips.
  • Spreads ballast and lays sleepers or metal plates at specified intervals.
  • Lubricates points, examines fences, drains, culverts and embankments and carries out any necessary maintenance.
  • Checks tightness of bolts and wedges, replaces damaged rail chairs and repacks ballast under sleepers if necessary.
  • Patrols length of track and visually inspects rails, bolts, fishplates and chairs for distortion or fracture.

Desired Skills

Reading Comprehension, Active Listening, Learning Strategies, Critical Thinking, Active Learning, Speaking, Monitoring, Writing, Mathematics, Science

Related Courses

    Sorry, no results were found.

You can download our course guide

Download